China industrial power source is: 380V, 3-Phase, 50Hz.
An accurate manufacturing lead time is basing on our real-time manufacturing schedule. Generally, if your local power source is the same as China, manufacturing lead time is around 30-35 days; If your local power source is different from China, then manufacturing lead time is around 45-50 days.
Because as you know, we should purchase customized motor for your voltage, and customized motors really takes long time. For some Imported Parts, for example imported pumps, roots blowers, they may take 4-5 months. So, the most parts we used are Chinese brands, they are not that famous, but we have used them for several years, we know which brands are reliable.
If you have specific requirements on the brands, or have limited time about the manufacturing lead time, please contact us, we will check the availability and reply to you soon.
Contact: Eng. Dover
Mobile: +86 17561675721
Whatsapp: +86 17561675721
QQ: 1049235017
Wechat: 1049235017
Email: dover@cnwwtp.com
Addr: Beiling, Machang Vil.
City: Qingdao, China.