Dissolved Air Flotation Manufacturer
Experienced DAF Dissolved Air Flotation Manufacturer in China
Whatsapp: +86 175 6167 5721 Email: dover@cnwwtp.com
Home / Tech Supports

Manufacturing Lead Time

China industrial power source is: 380V, 3-Phase, 50Hz.
An accurate manufacturing lead time is basing on our real-time manufacturing schedule. Generally, if your local power source is the same as China, manufacturing lead time is around 30-35 days; If your local power source is different from China, then manufacturing lead time is around 45-50 days.

Because as you know, we should purchase customized motor for your voltage, and customized motors really takes long time. For some Imported Parts, for example imported pumps, roots blowers, they may take 4-5 months. So, the most parts we used are Chinese brands, they are not that famous, but we have used them for several years, we know which brands are reliable.

If you have specific requirements on the brands, or have limited time about the manufacturing lead time, please contact us, we will check the availability and reply to you soon.

380V Wastewater Treatment Plant Equipment
Code: Code

CONTACT US

Contact: Eng. Dover

Mobile: +86 17561675721

Whatsapp: +86 17561675721

QQ: 1049235017

Wechat: 1049235017

Email: dover@cnwwtp.com

Addr: Beiling, Machang Vil.

City: Qingdao, China.

KEEP IN TOUCH

qr code